शनिवार, 29 नवंबर 2025
Where in the country has the solar panel system been installed between railway tracks for the first time?
Where is Asia's largest rail operations command center located?
Q. एशिया का सबसे बड़ा रेल ऑपरेशन कमांड सेंटर कहां बनाया गया है ? Q. Where is Asia's largest rail operations command center located? [Topic History of dfccil and railway]
Answer- C. अहमदाबाद (Ahmedabad)
Detail explanation:- Asia's largest rail operations command center is located in Sabarmati, Gujarat, India. This state-of-the-art facility was inaugurated to monitor and manage the Western Dedicated Freight Corridor (WDFC), a 1,506-kilometer long freight-only rail network.
एशिया का सबसे बड़ा रेल संचालन कमांड सेंटर साबरमती, गुजरात, भारत में स्थित है। इस अत्याधुनिक सुविधा का उद्घाटन पश्चिमी समर्पित माल ढुलाई गलियारे (WDFC) की निगरानी और प्रबंधन के लिए किया गया था, जो 1,506 किलोमीटर लंबा, केवल माल ढुलाई वाला रेल नेटवर्क है।
Dedicated freight corridor corporation of india limited (DFCCIL) releases Multitasking cut-off marks along with the result announcement for stages 1 CBT-1. MTS different posts Cut-off marks are released for all categories, such as General (UR), OBC, SC,ST and EWS. The cut-off marks are not predetermined and can vary each year based on a combination of factors. Candidates who appeared in the DFCCIL CBT1 exam can check the official cut-off marks and Score card.
** DFCCIL CBT1 RESULT Advt no. 01/DR/2025 has been Delared for CBT2 on 30.10.2025 with cutoff and List of candidates. i) Executive civil Candidates qualify in CBT2 LIST and CUT OFF. ii) Multi tasking staff (MTS) Candidates qualify in CBT2 LIST and CUT OFF. iii) Executive Electrical Candidates qualify in CBT2 LIST and CUT OFF. iv) Executive Signal & telecom (S&T) Candidates qualify in CBT2 LIST and CUT OFF. V) Junior Manager finance Candidates qualify in CBT2 LIST and CUT OFF. Score Card Notice as on 31.10.2025, LINK for view score card 2025
for Download E-BOOK & PDF history of railway and dfccil [CLICK HERE]
सोमवार, 17 नवंबर 2025
What is the length of railway tracks planned for gauge conversion as per Rail Budget 2018?
Q.3 रेल बजट 2018 के अनुसार गेज परिवर्तन के लिए योजनाबद्ध की गई रेलवे पटरियों (ट्रैक) की लम्बाई कितनी है?
Ans 4. 5000 km Hint for exam preparation: -
As of 2024, it manages the fourth largest national railway system by size with a track length of 135,207 km (84,014 mi), running track length of 109,748 km (68,194 mi) and route length of 69,181 km (42,987 mi). As of August 2024, 96.59% of the broad-gauge network is electrified.
2024 तक, यह आकार के हिसाब से चौथी सबसे बड़ी राष्ट्रीय रेल प्रणाली का प्रबंधन करता है, जिसकी ट्रैक लंबाई 135,207 किमी (84,014 मील), रनिंग ट्रैक लंबाई 109,748 किमी (68,194 मील) और रूट लंबाई 69,181 किमी (42,987 मील) है। अगस्त 2024 तक, ब्रॉड-गेज नेटवर्क का 96.59% विद्युतीकृत हो चुका है।
Dedicated freight corridor corporation of india limited (DFCCIL) releases Multitasking cut-off marks along with the result announcement for stages 1 CBT-1. MTS different posts Cut-off marks are released for all categories, such as General (UR), OBC, SC,ST and EWS. The cut-off marks are not predetermined and can vary each year based on a combination of factors. Candidates who appeared in the DFCCIL CBT1 exam can check the official cut-off marks and Score card.
** DFCCIL CBT1 RESULT Advt no. 01/DR/2025 has been Delared for CBT2 on 30.10.2025 with cutoff and List of candidates. i) Executive civil Candidates qualify in CBT2 LIST and CUT OFF. ii) Multi tasking staff (MTS) Candidates qualify in CBT2 LIST and CUT OFF. iii) Executive Electrical Candidates qualify in CBT2 LIST and CUT OFF. iv) Executive Signal & telecom (S&T) Candidates qualify in CBT2 LIST and CUT OFF. V) Junior Manager finance Candidates qualify in CBT2 LIST and CUT OFF. Score Card Notice as on 31.10.2025, LINK for view score card 2025
for Download E-BOOK & PDF history of railway and dfccil [CLICK HERE]
Which was the first zonal railway to be formed in April 1951?
Q.2 अप्रैल 1951 में निर्मित की जानेवाली पहली अंचल रेलवे कौन सी थी? [DFCCIL MTS CBT2 2018]
Ans 3. दक्षिण रेलवे Detail solution: - The first zonal railway formed in 14 April 1951 was Southern Railway, created by merging the Madras and Southern Mahratta Railway, the South Indian Railway Company, and the Mysore State Railway.
Dedicated freight corridor corporation of india limited (DFCCIL) releases Multitasking cut-off marks along with the result announcement for stages 1 CBT-1. MTS different posts Cut-off marks are released for all categories, such as General (UR), OBC, SC,ST and EWS. The cut-off marks are not predetermined and can vary each year based on a combination of factors. Candidates who appeared in the DFCCIL CBT1 exam can check the official cut-off marks and Score card.
** DFCCIL CBT1 RESULT Advt no. 01/DR/2025 has been Delared for CBT2 on 30.10.2025 with cutoff and List of candidates. i) Executive civil Candidates qualify in CBT2 LIST and CUT OFF. ii) Multi tasking staff (MTS) Candidates qualify in CBT2 LIST and CUT OFF. iii) Executive Electrical Candidates qualify in CBT2 LIST and CUT OFF. iv) Executive Signal & telecom (S&T) Candidates qualify in CBT2 LIST and CUT OFF. V) Junior Manager finance Candidates qualify in CBT2 LIST and CUT OFF. Score Card Notice as on 31.10.2025, LINK for view score card 2025
for Download E-BOOK & PDF history of railway and dfccil [CLICK HERE]
शुक्रवार, 14 नवंबर 2025
भारत में 1895 में पहले भाप इंजन का निर्माण कहाँ हुआ था?
Q.1 Where was the first steam engine manufactured in India in 1895? [MTS CBT2 2018 DFCCIL EXAM]
Ans 4. अजमेर [AJMER]
Solution: - पहला भाप इंजन (इंजन F-734), जो पूरी तरह से भारत में 1895 में निर्मित हुआ था, राजपूताना-मालवा रेलवे की अजमेर कार्यशाला में बनाया गया था। इससे पहले, 1862 में स्थापित जमालपुर रेलवे वर्कशॉप ने आयातित पुर्जों से इंजन बनाए थे, लेकिन F-734 देश में ही पूरी तरह से कच्चे माल से निर्मित होने वाला पहला इंजन था। The first steam locomotive (engine F-734), which was completely manufactured in India in 1895, was built in the Ajmer workshop of the Rajputana-Malwa Railway. Prior to this, Jamalpur Railway Workshops, established in 1862 had assembled locomotives from imported parts, but the F-734 was the first to be constructed entirely from raw material within the country.
Dedicated freight corridor corporation of india limited (DFCCIL) releases Multitasking cut-off marks along with the result announcement for stages 1 CBT-1. MTS different posts Cut-off marks are released for all categories, such as General (UR), OBC, SC,ST and EWS. The cut-off marks are not predetermined and can vary each year based on a combination of factors. Candidates who appeared in the DFCCIL CBT1 exam can check the official cut-off marks and Score card.
** DFCCIL CBT1 RESULT Advt no. 01/DR/2025 has been Delared for CBT2 on 30.10.2025 with cutoff and List of candidates. i) Executive civil Candidates qualify in CBT2 LIST and CUT OFF. ii) Multi tasking staff (MTS) Candidates qualify in CBT2 LIST and CUT OFF. iii) Executive Electrical Candidates qualify in CBT2 LIST and CUT OFF. iv) Executive Signal & telecom (S&T) Candidates qualify in CBT2 LIST and CUT OFF. V) Junior Manager finance Candidates qualify in CBT2 LIST and CUT OFF. Score Card Notice as on 31.10.2025, LINK for view score card 2025
for Download E-BOOK & PDF history of railway and dfccil [CLICK HERE]
भारतीय रेल द्वारा 1969 में आरंभ की जानेवाली पहली राजधानी एक्सप्रेस रेलगाड़ी कौन सी थी?
Q.28 Which was the first Rajdhani Express train introduced by Indian Railways in 1969? [MTS CBT2 2018 DFCCIL EXAM]
Ans-4. कोलकाता राजधानी [Kolkata Rajdhani]
The first Rajdhani Express was the Howrah–New Delhi Rajdhani Express, which began its service on March 1, 1969, connecting the two major cities with high-speed, air-conditioned travel. The first journey, flagged off from New Delhi to Howrah, completed the 1,450 km route in 17 hours and 20 minutes. पहली राजधानी एक्सप्रेस हावड़ा-नई दिल्ली राजधानी एक्सप्रेस थी, जिसकी सेवा 1 मार्च, 1969 को शुरू हुई थी और यह दो प्रमुख शहरों को तेज़ गति, वातानुकूलित यात्रा से जोड़ती थी। नई दिल्ली से हावड़ा के लिए रवाना हुई पहली यात्रा ने 1,450 किलोमीटर का रास्ता 17 घंटे 20 मिनट में पूरा किया।
Dedicated freight corridor corporation of india limited (DFCCIL) releases Multitasking cut-off marks along with the result announcement for stages 1 CBT-1. MTS different posts Cut-off marks are released for all categories, such as General (UR), OBC, SC,ST and EWS. The cut-off marks are not predetermined and can vary each year based on a combination of factors. Candidates who appeared in the DFCCIL CBT1 exam can check the official cut-off marks and Score card.
** DFCCIL CBT1 RESULT Advt no. 01/DR/2025 has been Delared for CBT2 on 30.10.2025 with cutoff and List of candidates. i) Executive civil Candidates qualify in CBT2 LIST and CUT OFF. ii) Multi tasking staff (MTS) Candidates qualify in CBT2 LIST and CUT OFF. iii) Executive Electrical Candidates qualify in CBT2 LIST and CUT OFF. iv) Executive Signal & telecom (S&T) Candidates qualify in CBT2 LIST and CUT OFF. V) Junior Manager finance Candidates qualify in CBT2 LIST and CUT OFF. Score Card Notice as on 31.10.2025, LINK for view score card 2025
for Download E-BOOK & PDF history of railway and dfccil [CLICK HERE]
31 मार्च 2017 की स्थिति के अनुसार, भारतीय रेल के पास कुल कितने माल-वाहक वैगन थे?
Q.33 As on 31 March 2017, how many freight wagons did Indian Railways have in total? [DFCCIL MTS CBT2 2018]
Solution: - 1 मार्च 2025 की स्थिति के अनुसार, भारतीय रेलवे के पास कुल 91,948 यात्री कोच और 3,18,196 मालगाड़ी वाले वैगन थे। As of 1 March 2025, Indian Railways had a total of 91,948 passenger coaches and 3,18,196 freight wagons.
Dedicated freight corridor corporation of india limited (DFCCIL) releases Multitasking cut-off marks along with the result announcement for stages 1 CBT-1. MTS different posts Cut-off marks are released for all categories, such as General (UR), OBC, SC,ST and EWS. The cut-off marks are not predetermined and can vary each year based on a combination of factors. Candidates who appeared in the DFCCIL CBT1 exam can check the official cut-off marks and Score card.
** DFCCIL CBT1 RESULT Advt no. 01/DR/2025 has been Delared for CBT2 on 30.10.2025 with cutoff and List of candidates. i) Executive civil Candidates qualify in CBT2 LIST and CUT OFF. ii) Multi tasking staff (MTS) Candidates qualify in CBT2 LIST and CUT OFF. iii) Executive Electrical Candidates qualify in CBT2 LIST and CUT OFF. iv) Executive Signal & telecom (S&T) Candidates qualify in CBT2 LIST and CUT OFF. V) Junior Manager finance Candidates qualify in CBT2 LIST and CUT OFF. Score Card Notice as on 31.10.2025, LINK for view score card 2025
for Download E-BOOK & PDF history of railway and dfccil [CLICK HERE]
रविवार, 9 नवंबर 2025
DFCCIL Executive Electrical CBT1 CUTOFF 2025 for CBT2 and previous years question paper By railway Life
Dedicated freight corridor corporation of india limited (DFCCIL) releases Executive Electrical cut-off marks along with the result announcement for stages 1 CBT-1. Executive electrical different posts Cut-off marks are released for all categories, such as General (UR), OBC, SC,ST and EWS. The cut-off marks are not predetermined and can vary each year based on a combination of factors. Candidates who appeared in the DFCCIL CBT1 exam can check the official cut-off marks and Score card. This article provides detailed information about the previous year's dfccil cut off and previous year's Executive electrical question paper.
for Download E-BOOK & PDF history of railway and dfccil [CLICK HERE]
About DFCCIL railway life Cutoff and data Analysis
|
DFCCIL EXECUTIVE ELECTRICAL 2025 CUT OFF ANALYSIS By railway Life |
|||||||
|
PARAMETERS |
UR |
OBC |
EWS |
SC |
ST |
TOTAL |
|
|
VACANCY |
28 |
14 |
6 |
11 |
5 |
64 |
|
|
TOTAL APPLICATION |
|
|
|
|
|
32411 |
|
|
Attendance 60% |
0 |
0 |
0 |
0 |
0 |
19447 |
|
|
PER POST CANDIDATES |
|
|
|
|
|
15.19 |
|
|
CBT2 20 Times Candidates |
560 |
280 |
120 |
220 |
100 |
1280 |
|
|
EXECUTIVE ELECTRICAL CBT1 SCORE OUT of 100 in ANSWER KEY May be change Due to social Media data |
|||||||
|
CBT-1 SCORE as per Response key |
UR |
OBC |
EWS |
SC |
ST |
TOTAL |
|
|
75-100 |
32 |
104 |
14 |
8 |
0 |
158 |
|
|
70-74 |
68 |
289 |
36 |
29 |
4 |
426 |
|
|
65-69 |
125 |
616 |
73 |
108 |
16 |
938 |
|
|
60-64 |
178 |
958 |
129 |
216 |
34 |
1515 |
|
|
55-59 |
236 |
1224 |
175 |
339 |
73 |
2047 |
|
|
50-54 |
279 |
1415 |
200 |
466 |
116 |
2476 |
|
|
00-49 |
399 |
1785 |
257 |
898 |
257 |
3596 |
|
|
DATA SAMPLE SIZE |
3596 |
||||||
|
RAILWAY LIFE ANALYSIS 2025 |
|||||||
|
60+ |
178 |
958 |
129 |
216 |
34 |
1515 |
|
|
|
|
|
|
|
|
42.13 |
|
|
UR CANDIDATES |
1280 |
8192.88 |
|
Fail |
xxxxxxx |
|
|
|
65+ |
125 |
616 |
73 |
108 |
16 |
938 |
|
|
|
|
|
|
|
|
26.08 |
|
|
UR CANDIDATES |
1280 |
5072.56 |
|
fail |
xxxxxxx |
|
|
|
70+ |
68 |
289 |
36 |
29 |
4 |
426 |
|
|
|
|
|
|
|
|
11.85 |
|
|
UR CANDIDATES |
1280 |
2303.74 |
|
|
PASS |
|
|
|
|
UR |
OBC (NCL) |
EWS |
SC |
ST |
|
|
|
CBT1 Expected CUT OFF |
70-75 |
66-72 |
60-66 |
58-65 |
57-63 |
|
|
|
CBT2 Official cut off 2025 |
72.22 |
69.70 |
62.88 |
64.14 |
57.07 |
36.12 pwbd |
30.30 ex-servicemen |
|
CBT2 20 Times Candidates |
560 |
280 |
120 |
220 |
100 |
1280 |
|
|
community Candidates cbt1 result to cbt2 exam |
104 |
591 |
296 |
236 |
85 |
1312 |
|
|
Qualify in UR Posts |
-456 |
311 |
176 |
16 |
-15 |
32 |
|
About DFCCIL EXECUTIVE ELECTRICAL 2023 CBT1, CBT2 Cutoff and data Analysis
|
Executive (Electrical) 2023 VACANCY ANALYSIS (Total Application - 23098) |
|||||||
|
COMMUNITY |
UR |
OBC |
EWS |
SC |
ST |
|
|
|
VACANCY |
14 |
8 |
2 |
4 |
2 |
|
|
|
CBT1 CUT OFF |
72.39 |
69.79 |
66.66 |
66.4 |
59.37 |
|
|
|
CBT2 Candidates |
280 |
160 |
40 |
80 |
40 |
|
|
|
CBT2 Attendance |
77 |
260 |
45 |
80 |
32 |
|
|
|
MINIMUM qualified in UR |
-203 |
100 |
5 |
0 |
-8 |
|
|
|
CBT2 to DV +ME EXAM RESULT CUT OFF (FINAL) out of 120 |
103.5 |
101.25 |
101.25 |
98.25 |
96.25 |
pwbd-84.5 |
ex-serviceman -70.50 |
DFCCIL PREVIOUS YEARS question paper of Executive ELECTRICAL in Hindi / English is given below.
Subject Executive Electrical Test Date 11/07/2025 Test Time 4:00 PM - 5:30 PM विषय: कार्यकारी विद्युत परीक्षा तिथि: 11/07/2025, परीक्षा समय: शाम 4:00 बजे से शाम 5:30 बजे तक
अनुभाग: रेलवे के बारे में ज्ञान, डीएफसीसीआईएल Section: Knowledge about Railways DFCCIL
Q.1 In which year was the Dedicated Freight Corridor Corporation of India Limited (DFCCIL) established? डेडिकेटेड फ्रेट कॉरिडोर कॉरपोरेशन ऑफ इंडिया लिमिटेड (डीएफसीसीआईएल) की स्थापना किस वर्ष की गई थी?
A. 2006 B. 2007 C. 2008 D. 2005
Ans- A. 2006
|
डेडिकेटेड फ्रेट कॉरिडोर कॉर्पोरेशन ऑफ इंडिया लिमिटेड (DFCCIL) की स्थापना 30 अक्टूबर 2006 को की गई थी। इसे कंपनी अधिनियम, 1956 के तहत रेल मंत्रालय के प्रशासनिक नियंत्रण में एक सार्वजनिक क्षेत्र के उपक्रम के रूप में गठित किया गया था। |
Q.2 How many Route kilometres (Rkm) did the Indian Railways electrify in 2024? 2024 में भारतीय रेलवे ने कितने रूट किलोमीटर (आरकेएम) का विद्युतीकरण किया?
A. 3,670 Rkm B. 3,210 Rkm C. 2,470 Rkm D. 4,010 Rkm
Ans- B. 3,210 Rkm
Q.3 The machine vision-based inspection of rolling stock in DFCCIL is done using technology developed in collaboration with _____. डीएफसीसीआईएल में रोलिंग स्टॉक का मशीन विजन-आधारित निरीक्षण ....... के सहयोग से विकसित प्रौद्योगिकी का उपयोग करके किया जाता है।
A. IIT Roorkee B. IIT Bombay
C. IISc Bengaluru D. IIT Delhi
Ans- C. IISc Bengaluru
|
The machine vision-based inspection of rolling stock in DFCCIL is done using technology developed in collaboration with the Indian Institute of Science (IISc), Bengaluru and its startup Lab To Market Innovations Pvt. Ltd. (L2M). |
Q.4 When was DFCCIL incorporated as a Schedule A company? डीएफसीसीआईएल को अनुसूची ए कंपनी के रूप में कब शामिल किया गया था?
A. 30 October 2006 B. 15 August 2005
C. 5 June 2004 D. 1 January 2007
Ans- A. 30 October 2006
|
डेडिकेटेड फ्रेट कॉरिडोर कॉर्पोरेशन ऑफ इंडिया लिमिटेड (DFCCIL) की स्थापना 30 अक्टूबर 2006 को की गई थी। इसे कंपनी अधिनियम, 1956 के तहत रेल मंत्रालय के प्रशासनिक नियंत्रण में एक सार्वजनिक क्षेत्र के उपक्रम के रूप में गठित किया गया था। |
Q.5 On which date did the first passenger train in India run between Bombay’s Bori Bunder and Thane? भारत में पहली यात्री रेलगाड़ी बॉम्बे के बोरीबंदर और थाने के बीच किस तारीख को चली थी?
A. 24 February 1873 B. 1 July 1856
C. 15 August 1854 D. 16 April 1853
Ans- D. 16 April 1853
Q.6 As of January 2025, what is the additional charge levied by the Dedicated Freight Corridor Corporation of India Limited (DFCCIL) as administrative/overhead charges on the land leased under the DFCCIL Land Licensing Policy? जनवरी 2025 तक, डीएफसीसीआईएल भूमि लाइसेंसिंग नीति के तहत पट्टे पर दी गई भूमि पर प्रशासनिक/ओवरहेड शुल्क के रूप में डेडिकेटेड फ्रेट कॉरिडोर कॉरपोरेशन ऑफ इंडिया लिमिटेड (डीएफसीसीआईएल) द्वारा लगाया गया अतिरिक्त शुल्क क्या है?
A. 2% per annum B. 1% per annum
C. 3% per annum D. 0.5% per annum
Ans- B. 1% per annum
Q.7 Minister for Railways made the announcement of creation of Dedicated Freight Corridors (DFCs) on floor of the House in the Parliament while presenting the Railway Budget of which year? रेल मंत्री ने किस वर्ष का रेल बजट पेश करते समय संसद में सदन के पटल पर समर्पित माल गलियारा (डीएफसी) के निर्माण की घोषणा की?
A. 2004-05 B. 2005-06
C. 2003-04 D. 2002-03
Ans - B. 2005-06
Q.8 Danapur, Dhanbad, Mughalsarai, Samastipur, and Sonpur divisions come under which of the following zones of Indian Railways? दानापुर, धनबाद, मुगलसराय, समस्तीपुर और सोनपुर मंडल भारतीय रेलवे के निम्नलिखित में से किस क्षेत्र के अंतर्गत आते हैं?
A. Eastern Railway B. North Eastern Railway
C. East Central Railway D. South Eastern Railway
Ans - C. East Central Railway
|
East Central Railway is divided into five divisions: Danapur, Danapur, Mughalsarai, Samastipur, and Sonpur. Its headquarters are located in Hajipur, Bihar. The railway zone's routes cover states like Bihar, Jharkhand, and Uttar Pradesh, serving as a vital link for transport in eastern India. |
Q.9 According to Union Minister Ashwini Vaishnaw’s statement regarding the Budget 2025- 26, how many Vande Bharat trains have been approved for manufacturing? केंद्रीय मंत्री अश्विनी वैष्णव के बजट 2025-26 के संबंध में दिए गए बयान के अनुसार, कितनी वंदे भारत ट्रेनों के निर्माण को मंजूरी दी गई है?
A. 250 B. 150 C. 200 D. 100
Ans - C. 200
Q.10 What is the full form of DFIS in the context of DFCCIL? डीएफसीसीआईएल के संदर्भ में डीएफआईएस का पूर्ण रूप क्या है?
A. Dedicated Freight Information System
B. Dedicated Freight Integration System
C. Dedicated Freight Innovation System
D. Dedicated Freight Intelligence System
Ans - A. Dedicated Freight Information System
|
"समर्पित माल सूचना प्रणाली" (DFIS), भारतीय समर्पित माल गलियारा निगम लिमिटेड (DFCCIL) द्वारा विकसित एक डिजिटल प्लेटफ़ॉर्म है जो भारत के समर्पित माल गलियारों के प्रबंधन और संचालन के लिए केंद्रीय केंद्र के रूप में कार्य करता है। यह वास्तविक समय की जानकारी प्रदान करने और रसद प्रबंधन के लिए उच्च-स्तरीय तकनीक और सूचना प्रौद्योगिकी का उपयोग करता है, जिसका उद्देश्य पूर्वी और पश्चिमी गलियारों के माध्यम से माल परिवहन की दक्षता, विश्वसनीयता और सुरक्षा को बढ़ाना है। |
